Workflow Drift Stream(JIRA:4.8.2)
VisualThe Workflow Drift Stream lists the saved changes to your workflow definitions, newest first, so a reviewer can see when a workflow changed and what the change consisted of. Jira records a new version of a workflow each time it is saved; MetaFrazo compares each new version with the one it recorded before and keeps the difference.
What you can conclude
- When a workflow's definition changed, and to which version.
- Which projects use the workflow that changed, so a change can be read against the projects it reaches.
- What the change consisted of: which transitions were added, removed or renamed, and which conditions, validators, post functions or screen settings were added, removed or reconfigured.
- Which changes removed a check a transition relied on, such as a validator or an approval condition, because those are rated critical.
- Which changes let work leave a finished status for an unfinished one it could not reach in one step before, because those are rated high.
- Whether any workflow changed in the selected time range. No change shows as a measured 0, together with the date from which MetaFrazo has been recording your workflows, so a range before that date is never read as a quiet one.
How this chart works
The strip at the top places each entry of the selected time range at the moment it was recorded: a filled dot in its severity's color for a change (red for critical, orange for high, amber for medium, green for low) and a hollow gray ring for a baseline. Below it, each change is one entry with its time, the workflow's name, the new version number and how many parts were added, removed or changed; open an entry to see each part. When your organization has one Jira site, the name links to that workflow in Jira's workflow settings, which Jira opens only for Jira administrators. Jira finds the workflow by its name, so the link to a workflow renamed after MetaFrazo last read it works again after the next read. A condition, validator or post function is named by its kind and the transition it sits on. Each entry also lists the projects that use its workflow: a company-managed workflow serves every project whose workflow scheme maps an issue type to it, and a team-managed workflow serves its own project. The list shows up to two project keys and how many more there are; hover over it for all of them. The time range is the one at the top of the page. When you pick a project there, the stream lists only the workflows that project uses.
How severity is rated
Each change takes the highest severity among its parts.
- Critical: a transition or a validator was removed, or a condition was removed that limits a transition by approval, assignee, permission, group or project role.
- High: a transition now lets work leave a finished status (one in Jira's Done category) for an unfinished status it could not reach in one step before, including through a global transition, which can be taken from any status. A transition out of a finished status that is itself new in this version, a global transition into a status that is new in this version, and a transition from one finished status to another are rated as added transitions. Changes recorded before the connector read each status's category were rated by the shape of the workflow alone, which did not detect a second way out of a finished status or a global transition; they keep the rating they were given. A status renamed in a new version is rated high too, because its new name shows on every board, filter, dashboard and report that uses the status.
- Medium: a transition was added, a status was removed, a status moved to another status category, or the settings of a validator or of an approval condition changed.
- Low: anything else, such as a renamed transition, another change to a status, an added status, condition, validator or post function, or a screen setting. A new version whose parts could not be classified is listed as low, with a note saying so.
Baselines
A baseline is the first snapshot MetaFrazo recorded of a workflow, at the version the workflow had then: when the connector was installed or when the workflow first appeared. It is not a change and carries no severity. Baselines are drawn on the strip and hidden from the list unless you include them.
What the stream does not show
- Who saved a change: no account is recorded for status and workflow changes, because the workflow definition the connector reads does not name the person who saved it, so an entry names no one; Jira's audit log records who updated a workflow.
- A status renamed since a version recorded without status names. A renamed status is listed when both versions carry the status's name; versions MetaFrazo recorded before it read status names carry none, so a status renamed between such a version and a later one is not listed as renamed.
- The name a workflow had at an older version. An entry shows the name MetaFrazo last recorded for the workflow, so a workflow renamed since then is listed under its newer name on every entry. Where no name has been recorded, the entry identifies the workflow by the first characters of its Jira id, with the full id on hover.
- The projects a workflow served at the time of a change. The list shows the projects MetaFrazo last recorded as using the workflow, not the ones it served when the change was saved: a project that moved to another workflow scheme since then is no longer listed, and one that moved onto it is. Where no project has been recorded for a workflow yet, the entry says so, and it is left out while a project is picked. MetaFrazo reads the projects again at every workflow read, so an entry that keeps saying so means the latest reads did not return the workflow's full list; it is retried at each read.
- The moment of the save. The connector reads workflows on a schedule, so a change is recorded at the next read rather than when it was saved.
- Repeat records. When more than one connector installation on your site recorded the same workflow version, as happens after a reinstall or a switch between installations, a definition change is shown once, at its earliest record, and a baseline is shown only when nothing about that version was recorded before it. An earlier baseline never hides a change.