Priority and Assignee Drift by Project(JIRA:1.2.9)
VisualWhen a ticket has its assignee or priority changed multiple times, the question it raises is who owns the work, how important it is, or both. Across a whole project, high drift rates on these fields mean ownership and priority move often after tickets are created.
What you can conclude
- High assignee drift in a single project means its tickets are often reassigned after creation; ask whether they start without an owner.
- High priority drift means priorities in that project change often after tickets are created.
- Projects with low drift scores rarely change a ticket's assignee or priority.
How this chart works
Grouped bar chart showing per-project counts of assignee and priority changes, ranked by a composite drift score. Assignee changes are weighted at 1.5x to reflect the higher risk of ownership transfers. Projects ordered by drift score descending.
How far back it reads
The chart reads at most the last 92 days, a calendar quarter, of the selected range, ending on the range's last day or today, whichever is earlier. A range that starts within those 92 days is read whole. For a longer range, or one with no start date, it counts the changes of those 92 days, and the panel says so beside its title. To review an earlier period, end the range there. This keeps the read within the panel's row limit however many projects the organization adds.
Which projects are drawn
With no project picked, the chart draws bars for at most twelve projects: the twelve with the highest drift score over the days it reads, which is the order the chart already draws. Ties go to the project key that sorts first. The drift score is a weighted count (each priority change counts once, each assignee change 1.5 times), so it adds up across projects, and every other project is drawn as one Other projects pair of bars: their assignee changes and their priority changes added up, in the same two colors. Other projects is not a project. Pick a project in the filter to see its own bars at any time; with twelve projects or fewer every project is drawn and there is no Other projects bar.