Last updated 2026-10-19
Workflow Discovery
Workflow Discovery draws the workflow your issues actually follow, reconstructed from their recorded history rather than from the workflow configured in Jira. Jira records every status change; Workflow Discovery assembles those changes into one map per project and time window, and lists under the map the moves your configured workflow defines, with how often each was used.
It is also where you set up how statuses are grouped into lanes and how accounts are grouped into roles. Flow Performance reads the same map and lays timing over it; see Flow Performance & Variant Explorer.
Mining a map
Pick a project, optionally an issue type, and a time range (the last 7, 30, 90, 180 or 365 days; the last 30 days by default), then press Mine. The site is named beside them; it becomes a list to pick from only when your organization has more than one Jira site sending events.
One press of Mine is one analysis: it reads the issue events of that project in the window, replays each issue's status changes into a path, and draws the map from those paths. It runs when you press the button and is kept with the time it ran, so the map is a snapshot rather than a live view.
- One analysis reads at most 50,000 of the project's events in the window, counted across every issue type. When the window holds more, it keeps the most recent, and a line under the map gives how many of them match your selection and the date and time from which the map is complete; a shorter window that starts after that point is mapped in full.
- Mine again with the same filters reuses the kept analysis. The window's end is rounded up to the next hour, so a window ending now is reused for up to an hour and leaves out events that arrived after it ran. The Source label says whether the map was analyzed just now or reused, and when.
- Re-mine runs a fresh analysis. It is available once every five minutes for the same selection.
- A change to your status or role mapping makes the next Mine run a fresh analysis.
Reading the map
- Circles are states. A state is the lane an issue's status is grouped into (or, for a status not grouped into a lane, that status itself), together with the issue type and whether the issue had an assignee, a resolution, fix versions or linked commits at that point. So one lane can hold more than one circle. Circles are drawn larger the more often issues visited them.
- Boxes are moves. Each box between two circles is a move issues made between those states, colored by the role that most often makes it.
- Arrows carry no measure. Every arrow is drawn in one gray at one width; on this page neither color nor width encodes time or volume. Flow Performance shades the same moves by how long work waited before them.
- Lanes. Inbox, To investigate, Investigated, To do, In progress, In test, Done and Rejected. A status you have not grouped into a lane is drawn as gray circles outside the lanes, each named under it by that Jira status, and the line above the map lists those statuses. Grouping a status into a lane merges it with the other statuses of that lane.
The configured workflow under the map
Under the map, Configured workflow lists the moves the project's configured Jira workflow defines, with how often each was used in the window.
- What it compares. The latest stored version of each workflow the project uses, as MetaFrazo last recorded it. A move is a change from one status to another. A global transition, which issues can take from any status, is listed once as a move from Any status. A move into a status in Jira's Done category is marked Done. Statuses are matched by their Jira status id, so a renamed status stays the same status.
- How it counts. The uses come from the same issue events as the map: every status change in the window, for the selected issue type, before the rare-path filter, so they can be higher than the moves drawn on the map. Each status change is counted once. Because statuses are matched by id and not by name, a status change recorded without the Jira status id it moved from or to is left out of the comparison, and a line under the list gives how many there were. A move that both a transition from its status and a global transition allow is counted on the transition from its status. When an analysis reached its 50,000-event limit, the uses count from the date the line under the map names, and the headline says "since" that date.
- Not used. A configured move that no status change recorded in the window matches. For a global transition, it can also mean that every move into its status was allowed by a transition from the issue's own status as well, because Jira does not record which transition was used. Whether the team still needs a move is a question for whoever owns the workflow.
- None recorded. A transition from a status to itself along which no move is recorded in the window. It is listed apart rather than as not used.
- Not in the configuration. A status change the latest stored version does not define, listed under the table with its count. Jira moves an issue only along its workflow's transitions, so such a change usually comes from a workflow edited during the window, an issue moved in from another project, or a project moved to another workflow scheme. When the latest version of a workflow was first recorded inside the window and an earlier version is recorded, a line says so.
- When a project uses more than one workflow, their moves are listed together, because MetaFrazo cannot tell which issue type uses which. When MetaFrazo has no recorded configured workflow for the project, the section says so, and when one of several workflows is not recorded yet, a line says that too. Each status is labeled with its name from the Jira workflow configuration as MetaFrazo last read it, or else from the issue events; a status with neither appears as "Status" and its Jira id. A renamed status therefore shows its current name in the list, while a circle on the map shows the name recorded in the window.
The rare-path filter and the counts under the map
The Filter threshold (1 to 20 percent, 5 by default) drops issues whose end-to-end route is rarer than that share of the issues that produced a path, before the map is drawn. A higher threshold gives a leaner map; a lower one keeps minority routes.
The line under the map accounts for every issue with activity in the window:
- on the map: issues whose route survived the filter;
- never changed state: issues with no move from one state to another in the window, including issues whose only status changes stayed inside one state;
- dropped by the rare-path filter: issues whose route was rarer than the threshold.
Those three add up to the issues considered, so the map does not have to hold every issue in the project. The path-shape figure counts the distinct routes seen before filtering, with the number kept beside it. When an analysis reached its 50,000-event limit, these counts cover the span named on the line beneath them rather than the whole window.
When the filter dropped most of the issues that changed state, a sentence under the counts says so: a lower threshold, or more statuses grouped into lanes, can keep more of them on the map. If a new analysis does not complete, the map and the line under it keep the earlier figures, marked "Showing earlier figures".
If one state would have more than twelve distinct moves out of it, the selection is too varied for one map; narrow the time range or pick one issue type and mine again.
Account type and role
These are two different things.
- Account type is what Jira reports for an account: a person, an app, a service-desk customer, or no type. MetaFrazo reads it; it is not inferred.
- Role (engineer, product owner, bot, SQA, architect, support manager, or unknown) comes from your organization's role mapping. An account Jira records as an app takes the bot role unless your mapping gives it another; any other account you have not mapped shows as unknown.
An action Jira records under a person's account is that person's, even when a tool acted on their behalf: the map cannot tell the two apart.
Setting up lanes and roles
Common status names such as Backlog, Open, In Progress and Done start out grouped into lanes. When the map has statuses or accounts you have not grouped, a line under the map says how many, with a button that opens Mappings. The Mappings panel lists the lanes and roles in force. Everyone in the organization can read it; only an owner or an admin can change it, and an account with two-factor authentication turned on confirms a code from its authenticator app first.
An owner or admin can:
- change the lane of a status or the role of an account in its own row;
- remove a row, after confirming it;
- add a row with Add mapping, picking a status or an account the mined map found without one. Only statuses and accounts that appear in your own Jira events can be picked, so mine a project first.
Above the rows of the Mappings panel sit two AI buttons, Suggest mappings and Suggest roles:
- Suggest mappings proposes a lane for each ungrouped status.
- Suggest roles proposes a role for each account without one, from how the account behaves rather than from its identity. It never proposes the bot role.
Each proposal opens for review, and nothing is saved until you press Apply. When everything is grouped, the panel says so and offers nothing to run. Any change shows on the map the next time you press Mine.
Ask the AI and export
Analyze runs three analyses of the map at once, each under its own heading: Bottlenecks, Rework loops and Workflow Report. If one of them fails, its heading says so and the other two still answer. The Ask Workflow box answers your own questions about the map and the configured workflow under it. Both answer in plain language, through your organization's AI provider, and appear once a mine has drawn a map. They read the map as it is drawn: each state by the label it has on the map, each wait as the hover on a move shows it, the window the map was mined for, and the configured moves with the counts the page shows. Export PDF opens your browser's print dialog for the page; choose "Save as PDF" as the destination.
The map's Description tab and its visual reference carry the same rules in full.