Daily Governance Score(JIRA:2.1.7)
VisualThis visual answers a question raw transition counts cannot: not "how many transitions happened?" but "how many of them entered a delivered status the way the workflow lays out?" The MetaFrazo Governance Score is a composite, and this chart tracks it day by day, each day read over the 7 days ending that day.
What the score is made of
Each project scores separately for a day's window, the 7 days ending that day, and the chart plots the average across the projects scored for that window. A project's score is the mean of the two dimensions below, and it is left empty unless both can be measured for it:
- Workflow adherence: of the entries into a delivered status, the share that did not come straight from a not-started status.
- Control coverage: the share of resolutions that did not come straight from a not-started status and, where the project logged time in Jira in the 84 days up to the day, carry a worklog.
What you can conclude
- A score consistently at 80 or above means most delivered work is passing through the workflow's own steps, with resolutions documented.
- A trend declining over two or more weeks is the pattern a reviewer would ask about; it says the mix has shifted, not why it shifted.
- Consecutive points share six of their seven days, so the line moves slowly; a step in it marks the day a week's worth of work entered or left the window.
How this chart works
Line chart with one point per day (0–100), each computed over the 7 days ending that day; each point is already a 7-day figure, so no average line is drawn over them. The day in progress is shown at its value so far. Because the day is not yet complete, it is marked as still in progress and does not enter the trend comparison.
Reading the average across projects
Because the plotted value is a mean over the projects scored, a day whose 7-day window scored only one project reads that project's score. A change in the line can therefore come from a change in scores, or from a change in which projects were active; check both before drawing a conclusion. A day on which no project could be scored is drawn as a break in the line rather than as a zero, so a quiet stretch shows as a gap at its true width.
Project-days that are not scored
A project is judged for a day over the 7 days ending that day. A project with no time logged in Jira in the 84 days up to a day is not held to the worklog check that day, and the day has no score for it: its control coverage would repeat the not-started-to-done check that workflow adherence already measures. A project that stops logging time is read this way 84 days after its last worklog. A project also needs at least 10 delivered resolutions in the 7 days ending that day to be scored for it: from one to nine, a single issue would decide the score. A project-day left unscored for either reason is not in the day's average, never counted as a zero, and the chart counts the projects of its latest complete day in one line, for example "8 scored · 24 no time logged · 13 too few resolutions".
Which direction is better
Higher is better: a higher score means more of the delivered work took the path the score measures. How our scores work sets every score's direction, inputs and reference levels side by side.