Risk Score Distribution by Project(JIRA:2.3.6)
VisualA few high-risk issues are isolated cases. A project where most open issues carry elevated risk scores is showing a portfolio-wide pattern rather than a handful of exceptions. This visual shows you the distribution of risk scores across all open issues per project, so you can see not just whether a project has any risky issues, but whether risk is the exception or the norm.
What you can conclude
- A project with a high median risk score carries elevated risk across most of its backlog, not in a few issues; a reviewer would ask what the whole backlog has in common.
- A project with a low median but a high maximum score has isolated outliers: a few specific issues score far above the rest.
- A project with zero critical-tier issues (score ≥80) has nothing in its open backlog above the critical threshold in this window.
How this chart works
Distribution chart showing risk score ranges per project by creation week: minimum, P25, median, P75, maximum, and count of critical-tier issues (score ≥80). Each project's bar describes the project as a whole: Median and P75 are the median and 75th percentile of the risk scores of all the project's open issues up to the end date, and Max is the highest of those scores. The scores are the Issue Risk Score Ranking's, so an issue's priority term reads the latest priority its events record, else, for an open issue whose events record none, the priority MetaFrazo read from Jira on the day it read it.
Which projects are drawn
With more than twelve projects, the chart draws the twelve with the most open issues by name, ties going to the project key that sorts first; ranking by volume rather than by score keeps a project with one or two issues from taking a place on a single high score. The other projects are drawn together as one group called Other projects: its Median, P75 and Max bars are the median of those projects' own median, P75 and maximum scores, because percentiles do not add up across projects, and its tooltip says how many projects and open issues it holds. The table under the chart and Deep Analysis still list every project. With twelve projects or fewer every project is drawn and there is no Other projects group. The project filter does not narrow this visual.
Which tickets count as open
A ticket counts as open when the latest status its events record is in Jira's To Do or In Progress category. A ticket deleted in Jira, or in a project moved to the trash or deleted, is not counted, and a ticket whose events record no status at all is left out. Tickets that have not changed status since MetaFrazo was installed are counted. A ticket moved to another project counts once, in the project of its latest event, so the tickets counted here are the ones the Issue Risk Score Ranking scores, on the same rule.
What the date range selects
This view carries one date per row (the week its issues were created) and no last-event counterpart, so the alive-in-window test the Issue Risk Score Ranking applies cannot be expressed here in full. Only the end date applies, in whole weeks: rows whose creation week ends on or before it are shown, as is the week in progress when the range reaches it, and the start date does not narrow the visual. Older creation weeks therefore stay visible, which is the intent, because the scores behind them are measured to the present moment.
Issues with no observed creation date
An issue that was already open when MetaFrazo was installed has no creation event, so its creation week cannot be computed and is left empty rather than filled in. Those rows show the week MetaFrazo first observed them in the Week column, marked "First seen" so it is not read as a creation week. They are not dropped. Each is grouped by the week MetaFrazo first observed it, so a pre-existing backlog appears as one row per observation week instead of one undated bucket, and the end date reaches it the same way it reaches every other row. Read those weeks as when the data starts, not as when the work started.
Which direction is better
Lower is better: a higher score means the issue carries more of the signals the score weighs. How our scores work sets every score's direction, inputs and reference levels side by side.