Control Coverage Rate(JIRA:4.7.6)
VisualControl coverage asks two questions of every resolved issue. Was a worklog recorded on it (asked only where the project logged time in Jira in the 84 days up to the week)? And was it resolved without ever jumping from a To Do status straight to a Done status that counts as delivered in a single step? The control coverage rate is the percentage of a project's resolutions for which every question asked is answered yes. It describes what Jira recorded for each resolution, not the quality of the work behind it.
What you can conclude
- A project with 88% coverage means 12% of its resolutions missed at least one of the two checks.
- A project far below the others, for example 60% against a portfolio mostly above 90%, is where a reviewer could ask which check its resolutions miss and whether that is expected for the kind of work it does.
- A project near 100% passes both checks on almost every resolution; the checks say nothing about what the worklogs contain.
- Each bar covers every week in the selected range, including the week in progress. The Avg control coverage card above reads the latest complete week on its own, so the two can legitimately disagree.
How this chart works
Horizontal bar chart showing, for each project it draws, the percentage of resolved issues that passed both checks (green) and the percentage that missed at least one (red). Statuses are judged by their Jira status category, and a resolution is a move into a Done-category status that counts as delivered under your organization's terminal-status settings (a MetaFrazo default applies until configured). A move into a status classified as abandoned is not counted as a resolution, and a move from a To Do status straight into one is not counted as a skip, as on Direct Open-to-Done Skip. A resolution misses the worklog check when no worklog was recorded on the issue at any point.
Projects that do not log time in Jira
The worklog check only means something where a team records time in Jira. A project with no time logged in Jira in the 84 days (12 weeks) up to a week, on any of its issues, is not held to the worklog check that week: the check reads not measured rather than failed. A project that stops logging time is read this way 12 weeks after its last worklog, and a single worklog holds a project to the check for the 12 weeks after it. Its resolutions then count as controlled when they never jumped from a To Do status straight to a Done status. A project that logged time in that window is held to both checks, as before. The chart counts the projects whose worklog check was not applied under it, and its hover names them, so a share built on one check is never read as a share built on two. Such a project at 0% resolved everything straight from a To Do status: that is a measured 0%, not a missing value. The Avg control coverage card above colors its value green at 95% or more, amber from 80% to 94% and red below 80%. Use the date and project filters to focus on specific teams or periods.
How far back it reads
The chart reads at most the last 92 days, a calendar quarter, of the selected range, ending on the range's last day or today, whichever is earlier. A range that starts within those 92 days is read whole. For a longer range, or one with no start date, it counts the weeks of those 92 days, and the panel says so beside its title. To review an earlier period, end the range there. This keeps the read within the panel's row limit however many projects the organization adds. The Avg control coverage card above covers the same days.
Which projects are drawn
With no project picked, the chart draws a bar for at most twelve projects: of the projects with at least 10 resolutions over the weeks it reads, the twelve with the lowest controlled share, each project's controlled resolutions over its resolutions, lowest first. Ties go to the project key that sorts first, and a project that resolved nothing has no bar. A share of one resolution is 0% or 100%, so a project with fewer than 10 resolutions is always in the Other projects bar, its resolutions pooled with the rest. A share's parts add up, so every other project is drawn as one Other projects bar: the controlled and uncontrolled share of all their resolutions taken together, so a project with more resolutions weighs more. Its bar keeps the green and red of the two shares and its label names it; it is not a project. The Avg control coverage card above still covers every project. Pick a project in the filter to see its own bar at any time; with twelve projects or fewer, each with at least 10 resolutions, every project is drawn, highest share first, and there is no Other projects bar.