Controlled vs. Uncontrolled Resolutions(JIRA:4.7.8)

Visual

This metric asks one question: what percentage of resolutions passed both of MetaFrazo's control checks, a worklog recorded on the issue (where the project logged time in Jira in the 84 days up to the week) and no jump from a To Do status straight to a Done status, and what percentage missed at least one? This visual tracks that ratio week by week, making it immediately visible whether the controlled share is rising or falling.

What you can conclude

  • A declining controlled percentage over multiple weeks means a growing share of resolutions missed at least one check.
  • A rising controlled percentage means a growing share of resolutions passed every check.
  • A stable high controlled percentage (above 90%) means nine in ten resolutions or more passed every check, week after week.

How this chart works

Weekly stacked 100% bar chart showing controlled resolutions (all compliance checks passed) versus uncontrolled resolutions (at least one check failed). Use the date and project filters to focus on specific teams or periods. The week in progress is shown at its value so far. Because the week is not yet complete, it covers only the resolutions recorded so far and can move in either direction as the week closes. Deep Analysis reads only the complete weeks and leaves the week in progress out.

Projects that do not log time in Jira

A project with no time logged in Jira in the 84 days (12 weeks) up to a week, on any of its issues, is not held to the worklog check that week: the check reads not measured rather than failed. A project that stops logging time is read this way 12 weeks after its last worklog, and a single worklog holds a project to the check for the 12 weeks after it. Its resolutions then count as controlled when they never jumped from a To Do status straight to a Done status. A project that logged time is held to both checks. When any resolution in the weeks drawn was read that way, the chart says how many, so a week's share is never read as resting on both checks when part of it rests on one.

How far back it reads

The chart reads at most the last 92 days, a calendar quarter, of the selected range, ending on the range's last day or today, whichever is earlier. A range that starts within those 92 days is read whole. For a longer range, or one with no start date, it draws the weeks of those 92 days, and the panel says so beside its title. To review an earlier period, end the range there. This keeps the read within the panel's row limit however many projects the organization adds.