Weekly Governance Score by Project(JIRA:4.7.5)

Visual

This chart shows the MetaFrazo Governance Score for each project, one week at a time. The score is the mean of two dimensions, both read from the week's delivered work: workflow adherence, the share of moves into a delivered status that came from a work-in-progress status, not straight from a to-do status; and control coverage, the share of delivered resolutions that never jumped from a to-do status straight to done and, where the project logged time in Jira in the 84 days up to the week, had a worklog recorded. A week that cannot measure both is left unscored. A score of 70 or above means the project reached MetaFrazo's 70-point reporting line that week. Below 70 means it did not; Governance Maturity Score by Project shows the two dimensions side by side, and Control Coverage Rate on this page shows the second one.

It is the same score that Daily Governance Score and Governance Maturity Score by Project show, computed the same way; this chart reads it week by week for each project. Configuration change volume is reported on its own and does not move it.

What you can conclude

  • A project consistently below 70 has stayed below the line on the two dimensions the score measures, and is the first project a reviewer would ask about.
  • A project that recovers to 70 or above after a dip shows the score moving back; set beside a dated change in how the team works, it is a record a reviewer can read.
  • A portfolio where all projects stay at 70 or above consistently reached the line on every project, week after week.

How this chart works

Multi-line time series showing the weekly Governance Score (0–100) per project. A line marks MetaFrazo's 70-point reference level. Use the date and project filters to focus on specific teams or periods.

The week in progress is not drawn: the chart ends at the most recent complete week. Deep Analysis reads the same complete weeks. When the range holds only the week in progress, the panel says so instead of drawing the chart.

Weeks that are not scored

A project with no time logged in Jira in the 84 days (12 weeks) up to a week, on any of its issues, is not held to the worklog check that week: the check reads not measured rather than failed. A project that stops logging time is read this way 12 weeks after its last worklog, and a single worklog holds a project to the check for the 12 weeks after it. Such a week has no MetaFrazo Governance Score: its control coverage would repeat the To Do jump check that workflow adherence already measures, so the project reads "Not scored: no time logged" and its workflow adherence is still measured. A week also needs at least 10 delivered resolutions to be scored: from one to nine, a single issue would decide the score, so the project reads "Not scored: too few resolutions" instead. A week that resolved nothing has no score, as before. The panel carries one line of counts for its latest complete week, for example "Week 46: 8 scored · 24 no time logged · 13 too few resolutions". Hover that line to see each project that is not scored, the reason, and its workflow adherence.

How far back it reads

The chart reads at most the last 92 days, a calendar quarter, of the selected range, ending on the range's last day or today, whichever is earlier. A range that starts within those 92 days is read whole. For a longer range, or one with no start date, it draws the complete weeks of those 92 days, and the panel says so beside its title. To review an earlier period, end the range there. This keeps the read within the panel's row limit however many projects the organization adds. The Avg governance score and Governance score below 70 cards above cover the same days.

Which projects are drawn

With no project picked, the chart draws a line for at most twelve projects: the twelve with the lowest average score over the complete weeks it shows, each project's scored weeks averaged and its unscored weeks left out. Ties go to the project key that sorts first, and a project with no scored week ranks after every scored one. A score does not add up across projects, so every other project is drawn as one gray Other projects line at the median of their scores each week: the middle score of the other projects scored that week, each project counting once whatever its volume, rounded to one decimal like the scores, and a gap in a week none of them could score. The median shows where the rest of the portfolio sits, not any one project. The Avg governance score and Governance score below 70 cards above still cover every project. Pick a project in the filter to see its own line at any time; with twelve projects or fewer every project is drawn and there is no Other projects line.

Which direction is better

Higher is better: a higher score means more of the delivered work took the path the score measures. How our scores work sets every score's direction, inputs and reference levels side by side.