Governance Maturity Score by Project(JIRA:3.4.4)
VisualGovernance maturity is not a single metric. It combines how work reaches completion and how controlled resolutions are. This visual breaks the composite score into its per-project dimensions so you can see not just the overall maturity level, but which dimension scores lowest.
What you can conclude
- A project with a low workflow adherence score is completing work that skips the working states its workflow defines: issues jump from a new status straight to done.
- A project with a low control coverage score is delivering issues without logged work or via skipped states; issues closed as abandoned or duplicate are not counted as resolutions, so completions carry less supporting evidence.
How this chart works
Multi-dimension bar chart showing scores (0-100) for each project drawn. Configuration change activity is site-scoped and lives in its own chart on this page. Both dimensions are derived from the week's completions, so a week with no completions supports neither and is left unscored rather than scored 0. Use the date and project filters to track specific teams or periods.
Every bar is read from the same week, the latest complete week in which at least one dimension could be measured, and the week in progress is not plotted. Projects with no measured dimension in that week are not listed, and are counted in the note above the chart. Deep Analysis reads only the complete weeks and leaves the week in progress out. A dimension measured at zero draws a short marker rather than nothing, so it is not mistaken for one that could not be measured. Comparing bar heights is the whole point of a per-project chart, so a bar measured in one week standing beside a bar measured two weeks earlier would not be a comparison. The Portfolio Composite Score card above reads that same week, so the card and the bars cannot describe different weeks.
Weeks that are not scored
A project with no time logged in Jira in the 84 days (12 weeks) up to a week, on any of its issues, is not held to the worklog check that week: the check reads not measured rather than failed. A project that stops logging time is read this way 12 weeks after its last worklog, and a single worklog holds a project to the check for the 12 weeks after it. Such a week has no MetaFrazo Governance Score: its control coverage would repeat the To Do jump check that workflow adherence already measures, so the project reads "Not scored: no time logged" and its workflow adherence is still measured. A week also needs at least 10 delivered resolutions to be scored: from one to nine, a single issue would decide the score, so the project reads "Not scored: too few resolutions" instead. A week that resolved nothing has no score, as before. The chart draws only the projects scored that week, and counts the projects of that week in one line, for example "Week 46: 8 scored · 24 no time logged · 13 too few resolutions". Hover that line to see each project that is not scored, the reason, and its workflow adherence. The Portfolio Composite Score card leaves the unscored ones out too.
How far back it reads
The chart reads at most the last 92 days, a calendar quarter, of the selected range, ending on the range's last day or today, whichever is earlier. A range that starts within those 92 days is read whole. For a longer range, or one with no start date, it shows the complete weeks of those 92 days, and the panel says so beside its title. To review an earlier period, end the range there. This keeps the read within the panel's row limit however many projects the organization adds.
Which projects are drawn
With no project picked, the chart draws bars for at most twelve projects: of the projects scored in the week drawn, the twelve with the lowest mean of their two scores (workflow adherence and control coverage). Ties go to the project key that sorts first. A score does not add up across projects, so every other project is drawn as one Other projects group: for each dimension, the median score of the other scored projects that week, each project counting once whatever its volume. The median shows where the rest of the portfolio sits, not any one project. Pick a project in the filter to see its own bars at any time; with twelve projects or fewer every project is drawn and there is no Other projects group.
Which direction is better
Higher is better: a higher score means more of the delivered work took the path the score measures. How our scores work sets every score's direction, inputs and reference levels side by side.