Portfolio Risk Composite Score Trend(JIRA:3.2.5)

Visual

A single risk score tells you where things stand today. A trend line tells you where they're heading. This visual shows the composite risk score for each project over time so you can see whether projects are drifting toward the escalation threshold or moving away from it, so the trajectory is visible, not just the current state.

What you can conclude

  • A project whose score is rising consistently week over week is moving toward the threshold; a reviewer could ask what is driving the rise.
  • A project whose score drops sharply after a specific week changed in that week; the chart shows when, not why.
  • Multiple projects converging toward the threshold simultaneously are rising together; ask whether they share a recent change, a new process or an outside pressure.

How this chart works

Multi-line time series showing composite risk score per project per week. A 70-point threshold line marks the escalation boundary. Score is computed from three weighted inputs: the share of completions that entered a done status straight from a to-do status (weight 30), the share of status transitions that reopened an issue (weight 25), and an event-volume term (weight 25). A reopen here is a move out of a status your organization classifies as delivered back to a status that is not done; an issue revived out of a status classified as abandoned is not a reopen. The weighted sum is expressed as a share of the weight the week could actually measure, so the scale is 0 to 100 whether two or three inputs were available; a week without completions is scored on its reopen share and event volume alone, which then carry the whole weight. Both shares count each status transition once, however many times the connector delivered the same change. Each is rated only where the week carries enough of its own evidence to support it—five status transitions for the reopen share, five completions for the bypass share—because below those counts a single event moves a share by tens of points; a week that can rate neither is left unscored. A week that can measure fewer than two of the three is left unscored and breaks the line rather than being drawn near zero. Project Risk Ranking JIRA:3.2.8 ranks projects by the transition deviation score, a different measure from this chart's composite risk score.

The week in progress is shown at its value so far. Because the week is not yet complete, it covers only the events recorded so far and can move in either direction as the week closes. Deep Analysis reads only the complete weeks and leaves the week in progress out. When the range holds only the week in progress, the panel says so instead of drawing the chart.

How far back it reads

The chart reads at most the last 92 days, a calendar quarter, of the selected range, ending on the range's last day or today, whichever is earlier. A range that starts within those 92 days is read whole. For a longer range, or one with no start date, it shows the complete weeks of those 92 days, and the panel says so beside its title. To review an earlier period, end the range there. This keeps the read within the panel's row limit however many projects the organization adds.

Which projects are drawn

With no project picked, the chart draws a line for at most twelve projects: the twelve with the highest average score over the complete weeks it shows, each project's scored weeks averaged and its unscored weeks left out. Ties go to the project key that sorts first, a project with no scored week ranks after every scored one, and the week in progress is drawn but does not count toward the choice. A score does not add up across projects, so every other project is drawn as one gray Other projects line at the median of their scores each week: the middle score of the other projects scored that week, each project counting once whatever its volume, and a gap in a week none of them could score. The median shows where the rest of the portfolio sits, not any one project. Pick a project in the filter to see its own line at any time; with twelve projects or fewer every project is drawn and there is no Other projects line. The reopen share here is measured against the week's status transitions, not against completed issues, so it is not the same measure as Reopen rates JIRA:1.3, which divide reopens by the issues delivered.

Which direction is better

Lower is better: a higher score means more of the bypasses, reopens and event volume the score blends. How our scores work sets every score's direction, inputs and reference levels side by side.