Risk Improvement Trajectory(JIRA:3.2.10)

Visual

Direction of change matters as much as current level. A project with a transition deviation score of 60 that has fallen from 80 has dropped 20 points, which this chart shows and a single snapshot does not. A project with a score of 40 that has risen from 20 has gained 20 points, a rise a single snapshot does not show either.

This diverging bar chart makes the four-week change in that score immediately visible across projects at once, so executives can see at a glance who is improving and who is getting worse.

What you can conclude

  • Projects with large positive bars (rising score) have the fastest-rising scores over the four weeks.
  • Projects with large negative bars have a falling score; the chart does not show why.
  • Projects near zero have stable risk profiles, neither improving nor deteriorating significantly. A change measured at exactly zero is drawn in neutral gray rather than in the improvement color, so a flat week is distinguishable from a week that improved.

How this chart works

Diverging bar chart showing four-week change in the transition deviation score per project. The score is the same one the Project Risk Ranking table publishes: within a week, the share of status transitions that moved an issue straight from a New status to a Done status, weighted together with the share that moved an issue back out of a delivered status (a revival out of an abandoned status is not counted). Both panels therefore describe the same number rather than two different ones. Bars extending right (positive) indicate risk increase; bars extending left (negative) indicate improvement. Projects ordered by magnitude of change. The comparison is the calendar week exactly four weeks before the week being read, so a project with no recorded activity in that week has no four-week comparison and shows no bar rather than a zero-length one.

This chart reads each project's latest complete week and does not count the week in progress. Projects report in different weeks, so the chart names no single week.

A project-week carrying fewer than 10 status transitions is not scored, and a project with no scored week does not appear on the chart at all. This is why the chart can show fewer projects than the portfolio holds: an absent project is one there was not enough workflow activity to measure, not one with nothing to report.

Which projects are drawn

With more than twelve projects measured, the chart draws the twelve with the largest four-week change by size, rises and falls alike, ties going to the project key that sorts first. The other measured projects are drawn together as one gray bar called Other projects, at the median four-week change among them, so it shows where a typical project outside the twelve stands rather than any one project's direction; it is drawn last, because none of those projects changed more than the twelfth. Deep Analysis still reads every project. With twelve measured projects or fewer every one is drawn and there is no Other projects bar.