Escalation Run Duration(JIRA:2.6.9)
VisualThis visual shows how many consecutive weeks each project has spent at or above the escalation threshold, making a project that sits at or above it for many weeks running impossible to overlook.
What you can conclude
- Projects with long runs at or above the threshold (4+ weeks) have held there across many consecutive scored weeks.
- A project that crossed the threshold recently and has been there for only 1–2 weeks has a short run so far; the next complete weeks show whether it extends.
- A project with zero escalation weeks in the period had no scored week at or above the escalation threshold in it.
How this chart works
Horizontal bar chart with one bar per escalation run, longest first. Each bar names its project and the first and last week of the run, so a project that crossed the threshold twice in the period shows two bars. Use the date filter to set the observation period.
Runs still in progress, and what the date range selects
A run whose most recent week is the current, still-filling week has no length yet (a week that is half over cannot be counted as a week the project spent at or above the threshold), so that run is counted but not plotted, and the number of such runs is stated in a line beneath the chart. Drawing it would put a bar of no length under a project that is escalating right now, in the calmest color the chart uses. Deep Analysis reads only the plotted runs, so it does not describe a run still in progress. When the range holds only the week in progress, the panel says so instead of drawing the chart.
The date range selects the runs that overlap the period rather than the runs that fit inside it, so a run longer than the window is visible in the window. It previously selected only runs that both started and ended within the period, which hid exactly the long runs this panel exists to show: a twelve-week run could not appear in any thirty-day window it spanned.