Escalation Trigger Attribution(JIRA:2.6.7)

Visual

A high escalation score can come from many different combinations of underlying signals. One project might score mainly on SLA breaches. Another might score mainly on reopen surges. A third might have both. This chart shows which signal contributes most to each project's score.

What you can conclude

  • If SLA breach rate dominates the score, the score comes mostly from resolved work that took longer than its target.
  • If reopen surge dominates, the score comes mostly from work returning out of a delivered state.
  • If stuck-issue growth dominates, the score comes mostly from issues sitting in one status longer than that status usually takes.

How this chart works

Stacked bar chart showing weekly escalation score broken down by contributing signal per project: SLA breach rate, reopen surge, and stuck-issue growth. Each segment's size represents its proportional contribution to the total score. Select a project to see its weekly timeline; leave unfiltered to compare each project's latest complete week, for at most twelve projects (see below).

Measured, zero, and not measured

The three contributions are measured independently, and any one of them can be unmeasurable in a week whose own signal fell below the volume floor for that signal. A segment reading 0.0 pts is a measurement: the signal was present and contributed nothing to the score that week. A contribution that could not be measured is not drawn at all, and its tooltip entry reads not measured this week. On a stacked bar an absent segment and a zero-height one are the same pixels, so the tooltip is where the two are told apart. A project for which none of the three signals could be measured is left off the axis entirely and named in a line beneath the chart, rather than drawn as a zero-height stack: a stack of no height under a project name reads as a project that contributed nothing, which is the opposite of what an unmeasured week means.

The SLA breach contribution is measured only against the SLA targets your organization set in Analysis policies, and only for issue types that have one. Until SLA targets are set for your Jira site it is never drawn, its tooltip entry reads not measured, no SLA targets set, and a line under the page title says so; the other two signals still score the week.

This chart reads each project's latest complete week and does not count the week in progress. Projects report in different weeks, so the chart names no single week.

How far back it reads

The chart reads at most the last 92 days, a calendar quarter, of the selected range, ending on the range's last day or today, whichever is earlier. A range that starts within those 92 days is read whole. For a longer range, or one with no start date, it shows those 92 days, and the panel says so beside its title. To review an earlier period, end the range there. With no project selected, a project whose latest complete week falls before those 92 days is not shown. This keeps the read within the panel's row limit however many projects the organization adds.

Which projects are drawn

With no project picked, the chart draws a bar for at most twelve projects: of the projects with an escalation score in their latest complete week, the twelve with the highest score there. Ties go to the project key that sorts first, and a project with no score stays off the axis and in the line beneath the chart, as before. A score does not add up across projects, so every other scored project is drawn as one Other projects bar: each segment is that signal's median contribution over those projects' latest complete weeks, each project counting once whatever its volume. The three medians can come from different projects, so the height of the Other projects bar is neither one project's score nor the median score; it shows where the rest of the portfolio sits on each signal. Pick a project in the filter to see its own weekly timeline at any time; with twelve projects or fewer every project is drawn and there is no Other projects bar. The reopen share here is measured against the week's status transitions, not against completed issues, so it is not the same measure as Reopen rates JIRA:1.3, which divide reopens by the issues delivered.