Escalation Score Timeline(JIRA:2.6.5)

Visual

This is the longitudinal view of each project's escalation score. Rather than showing where things stand today, it shows how the escalation score for each project has moved over time: whether projects are trending toward 70, stabilizing, or already past it and still climbing.

For executives reviewing governance trends, this shows how each project's score has moved week by week.

What you can conclude

  • A project whose score is rising consistently toward 70 shows how fast it is approaching it.
  • A project whose score dropped sharply after a specific week changed in that week; the chart shows when, not why.
  • A portfolio where all projects show declining scores over time has every project's score moving down.

How this chart works

Multi-line time series showing the escalation score per project per week. No threshold line is drawn: each week's score falls in one of three ranges, below 70, 70 to under 85, or 85 and above, so read a project's position against those values on the axis.

The score blends three measurements, each expressed as a percentage so that a large project and a small one are comparable: the share of the week's resolved issues that took longer than their SLA target (weighted 35), the share of the week's status changes that were reopens (weighted 25), and the share of the week's issues that stalled rather than moved (weighted 20). An issue counts as stalled once it has sat in the same status longer than two and a half times the usual time for that status, and at least a day.

The first measurement uses only the SLA targets your organization set in Analysis policies. A resolved issue whose type has no target is not counted in it, and until SLA targets are set for your Jira site it is not measured at all, so each week is scored on the other two. No target is assumed on your behalf.

A week is only scored on the measurements it has enough activity to support: at least three resolved issues with an SLA target, five status changes, or three issues respectively. The score is the weighted average of whichever measurements qualify, so a quiet week is not penalized for the ones it cannot support. Where a week supports fewer than two of them the line is left blank rather than drawn at zero: a gap means too little happened to judge, never that risk was absent.

The week in progress is shown at its value so far. Because the week is not yet complete, it covers only the events recorded so far and can move in either direction as the week closes. Deep Analysis reads only the complete weeks and leaves the week in progress out. When the range holds only the week in progress, the panel says so instead of drawing the chart. Above its reading, Deep Analysis shows each project's direction over the complete weeks, computed by MetaFrazo rather than by the AI: whether its score rose every week, fell every week or did neither, its latest score, how far that score sits below 70, and the largest falls from one week to the next, largest first. The reading comments on those figures rather than restating them, and any sentence of it that carries a figure is removed, with a note saying so.

How far back it reads

The chart reads at most the last 92 days, a calendar quarter, of the selected range, ending on the range's last day or today, whichever is earlier. A range that starts within those 92 days is read whole. For a longer range, or one with no start date, it draws those 92 days, and the panel says so beside its title. To review an earlier period, end the range there. This keeps the read within the panel's row limit however many projects the organization adds.

Which projects are drawn

With no project picked, the chart draws a line for at most twelve projects: the twelve with the highest average escalation score over the complete weeks it shows, each project's scored weeks averaged and its unscored weeks left out. Ties go to the project key that sorts first, a project with no scored week ranks after every scored one, and the week in progress is drawn but does not count toward the choice. A score does not add up across projects, so every other project is drawn as one gray Other projects line at the median of their scores each week: the middle score of the other projects scored that week, each project counting once whatever its volume, rounded to one decimal like the scores, and a gap in a week none of them could score. The median shows where the rest of the portfolio sits, not any one project. Pick a project in the filter to see its own line at any time; with twelve projects or fewer every project is drawn and there is no Other projects line. The reopen share here is measured against the week's status transitions, not against completed issues, so it is not the same measure as Reopen rates JIRA:1.3, which divide reopens by the issues delivered.

Which direction is better

Lower is better: a higher score means more of the week's resolved issues ran past their target, were reopened or stalled. How our scores work sets every score's direction, inputs and reference levels side by side.