WIP Aging(JIRA:1.4.11)

Visual

Open issues whose latest recorded status is in Jira's In Progress category, each placed by its age: the time since the issue first moved into a status of that category, the same start the Cycle Time Scatterplot JIRA:1.7.12 measures cycle time from. An issue that went back to To Do before it was delivered keeps its first start; an issue reopened after it was delivered starts again at its next move into In Progress, so the time it spent delivered is not counted. Closing an issue as abandoned and reopening it does not restart it. Each age is set against the project's P50, P85 and P95 cycle times over the issues it delivered in the 90 days that end today: half of those issues took no longer than the P50 from start to delivery, 85 in 100 no longer than the P85, and 95 in 100 no longer than the P95. An issue deleted in Jira, or in a project moved to the trash or deleted, is not counted, and an issue whose events record no status at all is left out; an issue whose move into its current status was not recorded is not drawn. The page's date range does not narrow this visual: it is a snapshot of everything in progress now, and the bands always cover the last 90 days. Click a dot to open the issue in Jira. Use the project filter to focus the view.

The bands, and not enough data

The bands are each project's own, so an issue is compared only with what its own project delivered. Each percentile is interpolated between the two delivered cycle times around its rank (a continuous percentile), the method Cycle Time Scatterplot uses, so for the same project and the same 90 days the band edges here equal the lines there. The delivered issues are those that reached a delivered status under your organization's terminal-status settings (a MetaFrazo default reading of the status name applies until configured) after passing through a status of Jira's In Progress category. The priority filter narrows the issues drawn, not the bands.

A project with fewer than 10 issues delivered in the 90 days has no bands: its issues are drawn in the Not enough data column rather than against edges that a handful of issues cannot set. A band edge at 0.0 days is a measured value, not a missing one: at least half of the project's recently delivered issues went from start to delivery within about an hour, so an issue in progress for longer sits above its P50.

Age and time in the current status

Hover a dot for the issue key, its band, its age, the time it has spent in its current status and that status, its priority, and its project's band edges. The two figures differ when an issue has moved between In Progress statuses, for example from In Progress to In Review: the age keeps counting from the first start, while the time in the current status starts again at each move. Priority is the latest one the issue's events record, else, for an issue whose events record none, the priority MetaFrazo read from Jira on the day it read it; a dash means neither source supplied one.

How this chart works

Scatter plot with five columns: Within P50, P50 to P85, P85 to P95, Beyond P95, and Not enough data. Each column's oldest issues (up to 24 per column) are drawn as individual dots, placed by age on a logarithmic Y axis, so that issues a few hours old and issues several months old stay readable on one chart, and colored by column. An issue in progress for less than about an hour is drawn on the axis floor; its hover gives its age. Every dot is the same size. A column's dots are spread across its width in an order set by the issue key, not by age, so the drawn issues stay individually visible and keep their places on every load. The heading above each column prints its full issue count, so nothing outside the drawn set is hidden silently. The age axis is marked at 1 hour, 1 day, 1 week and 1, 3 and 6 months.