Cycle Time Scatterplot(JIRA:1.7.12)
VisualIndividual delivered-issue cycle times plotted by delivery date, with the project's P50, P85 and P95 cycle times over its last 90 days or, under Mean ± 2σ, the mean and upper / lower control limits (mean plus or minus two standard deviations) computed over every delivered cycle the project has, not over a recent window. The lower limit is shown only where two standard deviations below the mean is above zero; on the right-skewed spread typical of cycle times that bound falls below zero, no cycle could reach it, and the chart shows no lower limit rather than a line at zero. A project with fewer than five delivered cycles is not given control limits: one cycle has no standard deviation at all, and two to four give a spread that moves sharply with the next ticket, so limits drawn there would state a precision the data does not have. Its points carry no signal either: with too little distribution to compare against, they are drawn in gray as unrated, not in blue as if they were in control. A project whose upper limit would sit less than 0.1 days above its mean has too little variation to set limits and is not given them either: the limit and the mean would print as one line, and a point minutes slower than the mean would read as outside it, so its points are drawn in gray as unrated too. Points outside the control limits are statistically unusual for their project. Click a point to open the issue in Jira. Use the date and project filters to focus the view.
Percentile lines
The default lines are the project's P50, P85 and P95 cycle times: half of its issues delivered in the window took no longer than the P50, 85 in 100 no longer than the P85, and 95 in 100 no longer than the P95. The window is the 90 days that end today, whatever date range is picked, so the lines can describe a different period than the points; the line under the chart names the window and how many issues it holds. The issue-type filter narrows the lines as it narrows the points. Each percentile is interpolated between the two delivered cycle times around its rank (a continuous percentile), so it can sit between two issues.
A project with fewer than 10 issues delivered in the window gets no percentile lines, and the line under the chart says there is not enough data. Below 10 the 95th percentile is the slowest issue under another name, so a line would state a precision a handful of issues does not have. A line at 0.0 days is a measured value, not a missing one: the issues at that rank went from in progress to delivered within about an hour. In this mode every point is drawn in one color; the colors that compare a point with its project's limits belong to Mean ± 2σ.
When the reference lines appear
Control limits describe one project's distribution, so a single mean or limit cannot be true of several projects at once. The lines are therefore drawn only when the plotted issues all belong to one project; use the project filter to bring them back. With more than one project in view the chart plots the points and omits the three lines.
Nothing is lost by that. Each point is colored against its own project's limits, computed in the data rather than read off the drawn line, so the coral and green points carry the same verdict whether or not a line is on screen. A coral point among several projects means that issue was slow for the project it belongs to.
How this chart works
Scatter plot of individual delivered issues plotted by delivery date (X) and cycle time in days (Y). Issues closed into an abandoned or duplicate status are not plotted and do not move the mean or the control limits. Each delivered issue is one point even if its issue type changed while it was open: the point carries the type the issue holds most recently, identified by its Jira issue-type id, so a renamed type does not split a project's points or move its limits. Where the lines are drawn, they are the mean (solid gray), the upper control limit at two standard deviations above it (dashed coral), and, where that bound exists, the lower control limit (dashed green). Under Mean ± 2σ, points are colored by their statistical signal: coral above the project's upper limit (statistically slow outliers), green below its lower limit (statistically fast), blue for in-control. Gray marks an unrated point: the project has fewer than five delivered cycles, so there are no limits and no verdict is possible. The same holds for a project with too little variation to set limits. The comparison is made against the project's own limits rounded to the same two decimals the chart would draw, so a point sitting on a line reads as in-control rather than as an outlier. Where a project has no lower limit, none of its points can be green. When no plotted project has a lower limit, the Below LCL legend entry is left out rather than promising a category no point can reach.
Use the date, project, and issue-type filters to focus. Hover a point for the issue key, cycle days, and, under Mean ± 2σ, its signal.
What Deep Analysis reads
Deep Analysis reads each project's figures, computed from every point in view, rather than the points one by one: its mean and limits, how many of its points sit above the upper limit in the 30 days that end on the range's last day and how many before them, and at most three of those points as examples, the most recent first and then the slowest. It names a run where six or more consecutive points of one project sit above its mean, or each is slower than the one before. A project the chart does not rate, with fewer than five delivered cycles or too little variation to set limits, is not rated there either. It reads the lines the chart shows. Under the percentile lines it reads each project's points shown and each project's P50, P85 and P95 over the last 90 days with the window and the issues behind them, or that there were too few to set them, and nothing about the mean or the limits. Under Mean ± 2σ it reads the mean and the limits as above, and no percentile.